Bus Stop:
PEARL ST/FULTON ST
Buses en-route:
- 2 minutes,1 stop away, ~28 passengers on vehicle Vehicle 6047
- 90 minutes,6.1 miles away Vehicle 5982
M15-SBS SELECT BUS SERVICE SOUTH FERRY via 2 AV
- 17 minutes,1.9 miles away Vehicle 6221
- 24 minutes,2.7 miles away, ~32 passengers on vehicle Vehicle 6223
- 28 minutes,3.0 miles away, ~45 passengers on vehicle Vehicle 6215
SIM5 ELTVLLE TRANS CTR via F CAP BL via GFRDS
- 15.6 miles away (+ layover, scheduled to depart terminal at 6:00 PM) Vehicle 1655
SIM15 ELTINGVILLE TRANSIT CENTER via RICHMOND
- 9 minutes,1.0 miles away, ~11 passengers on vehicle Vehicle 2549
- 12 minutes,1.4 miles away (at terminal) Vehicle 2752
- 18.6 miles away (+ layover, scheduled to depart terminal at 5:30 PM) Vehicle 2623
SIM35 PORT RICHMOND via CLOVE RD
- 3 minutes,< 1 stop away (at terminal, scheduled to depart at 4:40 PM) Vehicle 2589
- 12.7 miles away (+ layover, scheduled to depart terminal at 5:45 PM) Vehicle 1630
- 12.8 miles away (+ layover, scheduled to depart terminal at 6:05 PM) Vehicle 1694
No scheduled service at this time for:
Service Alert:
- Northbound M15-SBS stop on Water St at Pine St is closed, buses make a temporary stop across the intersection on Water St at Pine St
See a map of this stop change.
~If paying with MetroCard, obtain tickets from the vending machine at the original stop on Water St/Pine St.
What's happening?
Construction
Note: Bus arrival information may not be available/accurate while buses are detoured - M15 stops on South St at Whitehall St in both directions and southbound stop on Broad St at South St are closed
Here is a map of the stop change.
What's happening?
Winter storm recovery
Note: Bus arrival information may not be available/accurate while buses are detoured - The 4:59 PM SIM15 bus trip scheduled to depart Eltingville Transit Center will not run.
We're running as much service as we can with the operators we have available. - Northbound M15 stop on 1st Ave at E 77th St is being bypassed
Please use the stops on 1st Ave at E 75th St or E 81st St instead.
What's happening?
Construction